A Quick Site Checklist
Good for Construction (GFC) drawings are final, coordinated, and dimensionally verified documents issued for execution. Incomplete drawings lead to rework, delays, and cost overruns.
Minimum GFC Drawing Set
Dimensioned layout with partitions and door schedule
Flooring layout with finish levels
Reflected ceiling plan with services coordination
Electrical layout with mounting heights
Joinery details with internal dimensions
Wall finish elevations with material codes